To their credit (or was it due to all the
phone calls) the Tazian's invited some resident's of Perry Lake Estates to a
meeting to discuss their plans (see below). The meeting was set for Tuesday, February 7th -
2 days before the Planning Commission hearing. Approximately 15 Perry Lake
residents attended along with an attorney. The Tazian's gave some background on
their developments, some background on the plat in question, presented the
proposed plat (see below) and answered questions. Per the Tazian's they were proposing 22
lots with anticipated lot prices of $40,000 - $55,000 and homes (equal to Perry
Lake minimums) with basements that were anticipated to range from $200,000 to
$350,000.
The questions and response by the Tazian's
were as follows:
| Question |
Response |
|
1. What are you planning for
construction access? |
Worthington Dr. and Galloway Cove will be used.
We wish there was another way and we are willing to investigate other
alternatives for the initial building of the roads. |
|
2. Would you be willing to post a
bond to cover any damage to the streets? |
The streets are covered under a bond (later
determined to be until Oct-2006) and after that they are the
responsibility of the County. |
|
3. Is the land suitable to build
homes with basements? |
Absolutely. In fact we don't anticipate using
any pilings like some of the existing homes in Perry Lake. |
|
4. How can you use the streets? The
Highway department says they are not rated for that type of
construction? |
They are public streets and while I wish there
was another way, there is no way that anyone can stop me from using
public streets. |
|
5. Why didn't you develop it 2 years
ago before Perry Lake was finished? |
We didn't own all the land. Originally Mike
(Thomas) and I were going to develop it together. then Mike decided to
sell. Also, the area ran out of sewer capacity and it cost me a lot of
money to increase the capacity. (Of course I was then able to build out
section VI ~80 homes.) |
|
6. Why can't you bring access down
where your sewer lines are going to be? |
We'll look at it, but not sure if there is enough
room. |
Invitation Letter